CHECKLIST 6-C
Inspection and Posting
Name: ______________________ Date: _____________ Time: _____________
Reports to: |
Planning and Intelligence Team Leader |
Location: |
Grossmont Campus Emergency Operations Center (EOC) and/or Cuyamaca Command Center |
|
Primary |
|
|
Support |
|
Supplies: |
District radio, ATC-20 Forms and procedures, Safety equipment for Damage Inspection Teams. |
PROCEDURES |
TIME/DATE |
| EMERGENCY RESPONSE: | |
Report to the EOC and/or CC. Sign in with Situation Status (Log Keeper). Immediately get a report on emergency conditions and situations. |
|
| Coordinate with the Manager and Operations Officer to determine their priorities for the initial building inspections. Develop a priority list; also determining if it is safe for the inspectors. | |
| Coordinate with the Operations Officer to assign the Building and Utility teams and schedule inspections of the buildings, insuring they are provided with safety and personal protective equipment. | |
| Have teams use the building safety inspection forms in ATC-20. Receive reports and keep files on damaged buildings. Forward copies of reports and information to OES/FEMA for application documentation. | |
| Post and secure damaged buildings and recommend emergency repairs. Follow the guidelines in ATC-20. If inspection operations require further inspection, request inspectors from the City of El Cajon and/or the County. Request and contact utility and contracted resources as needed for special areas. | |
| Have teams provide sketches and photographs of damage. File all documentation by campus and building. Forward files to the FEMA/OES position for verification of disaster assistance applications. | |
| RECOVERY: | |
| Provide information, recommendations, and assistance to the Planning and Intelligence Officer for the After-Action Report. | |
| Support Finance and Administration with the OES/FEMA disaster assistance application process. |